Header Image

Header Image

Friday, September 12, 2014

Site clearing and excavation


Stacking logs
Hauling away slash and stumps
Moving the old outhouse out of the way
Excavating the building site
Large rock slabs removed
Excavating down to solid sandstone rock
Steve with the excavator
Steve
Using the large jackhammer to break out rock
Hauling away logs; Steve and Peter
One load of firewood
One load of saw logs. These will later be cut into beams.
Steve building the "Great Wall."
Cleaned up to bare solid rock
Solid rock under the kitchen
More jackhammer time to carve out space for the cisterns 




No comments:

Post a Comment