Header Image

Header Image

Tuesday, July 26, 2016

Off-Grid Solar Equipment

Received a shipment of solar power equipent, including a
palette with 15 270W solar panels, a palette with a whole
bunch of batteries, and another palette with all the electronics.


Five stacks of Aquion batteries. Each stack weighs 250 pounds
or 118 kilos.

Boxes of electronics, including the inverter
and solar charge controller.

The battery stacks were transported up to the house and placed
in the battery room with the help of Paul, Shane, and Jordan, as well
as our trusted VW Van.

The battery bank in the battery room.
Each stack is 48 V and has a capacity of 2.2 kWh

The GSLC, the box where all the wiring hook-ups
to the outside world are made (solar array, battery bank,
generator input, grid input (if used)).

A diagram showing the wiring.

This is the display unit for monitoring and programming the system,
and connecting to the internet for remote monitoring.

The fully assembled inverter (Outback Radian) and
charge controller. (Outback Flexmax)

Friday, July 22, 2016

The Garden in July


Judy, the proud gardener is showing off her
Scarlet Runner (beans). The deer would love to get
at this plant and graze off anything that sticks out
through the wire mesh.
Scarlet Runner

Scarlet Runner - close-up
Success with carrots and beets
This was meant to be an ornamental garden. But an opportunistic seed
of a squash and a tomato took over and pushed everything else aside.
We are looking forward to harvesting these volunteers, if the deer
don't get them first.
One of my favourites - Rose Campion

Rose Campion

Cotton Lavender

Cotton Lavender

Batchelor Buttons

Batchelor Buttons

Borage, a herb

White Batchelor Buttons

Beebalm

Monday, July 18, 2016

Gyprock Installation (gypsum board wall covering)

Matthew is working at installing gyprock
(gypsum board) on all of the interior walls.

Danny is working at installing the edge trim around all of the
interfaces between gyprock and wooden posts and beams. He
is careful to create a uniform 3mm shadow line all around.

The shadow line is clearly visible to keep the edge of the gyprock
away from the wooden Posts and beams.

A new look is emerging above the desk.

New look above desk and bed.
Urs is installing gyprock on the walls in the crawl space.

Gyprock in crawlspace, under the main floor.

A cleaner look. The wall insulation is covered and protected.

Insulation in the battery room - partly with
rockwool, vapour barrier and gyprock;
partly with solid foam board.