Matthew is working at installing gyprock (gypsum board) on all of the interior walls. |
Danny is working at installing the edge trim around all of the interfaces between gyprock and wooden posts and beams. He is careful to create a uniform 3mm shadow line all around. |
The shadow line is clearly visible to keep the edge of the gyprock away from the wooden Posts and beams. |
A new look is emerging above the desk. |
New look above desk and bed. |
Urs is installing gyprock on the walls in the crawl space. |
Gyprock in crawlspace, under the main floor. |
A cleaner look. The wall insulation is covered and protected. |
Insulation in the battery room - partly with rockwool, vapour barrier and gyprock; partly with solid foam board. |
No comments:
Post a Comment