Saturday, April 18, 2015

Roofing, Siding, Electrical

Roof details.

Roof valley between the 10 / 12 roof
over the main house and the 3 / 12 roof
over the kitchen and verandas.

Roof detail over the back steps.

The chimney has been installed.

Paul and Shane working on the roof.

Barry is working at the rain screen, which is
installed under the siding.

The beginnings of the electrical installation.

Tricky drilling from two sides of a corner, where
an electrical cable will be pulled through.