![]() |
Roof details. |
![]() |
Roof valley between the 10 / 12 roof over the main house and the 3 / 12 roof over the kitchen and verandas. |
![]() |
Roof detail over the back steps. |
![]() |
The chimney has been installed. |
![]() |
Paul and Shane working on the roof. |
![]() |
Barry is working at the rain screen, which is installed under the siding. |
![]() |
The beginnings of the electrical installation. |
![]() |
Tricky drilling from two sides of a corner, where an electrical cable will be pulled through. |
No comments:
Post a Comment