![]() |
Scott installing in-floor heating lines. |
![]() |
In-floor heating lines will be embedded in concrete. |
![]() |
Heating, electrical, plumbing, vacuum. |
![]() |
Electrical panel and most of the wiring done. |
![]() |
Shane working at siding in the carport. |
![]() |
Old and new - the 20 year old cabin in the foreground. |
![]() |
The still unfinished mural at the cabin. |
![]() |
View from the east. The old outhouse with a view into the forest, in the foreground. |
![]() |
The east side of the new cottage. |
![]() |
Wisps of cirrus clouds and sunset over the Gulf Islands. |
No comments:
Post a Comment