Laying out the solar array on difficult ground, on the slope down from the house. |
There are 14 posts to be accurately located and fixed to the underlying rock. |
Getting there, after checking and re-checking and re-checking. |
Cutting and bending re-bar for reinforcement of the concrete. |
Heavy duty re-bar cutter and bender. |
Some of the pieces ready to be placed. |
Sono Tubes will be used as forms for the concrete columns. |
Drilling holes into solid rock for cementing bolts and re-bar directly into Pender Island, as we call any unmovable rock. |
This is the re-bar structure inside one of the concrete columns. The verticals are cemented 15cm (6") into Pender Island. |
Making progress with putting together the re-bar structures. |