| Laying out the solar array on difficult ground, on the slope down from the house. |
![]() |
| There are 14 posts to be accurately located and fixed to the underlying rock. |
![]() |
| Getting there, after checking and re-checking and re-checking. |
![]() |
| Cutting and bending re-bar for reinforcement of the concrete. |
![]() |
| Heavy duty re-bar cutter and bender. |
![]() |
| Some of the pieces ready to be placed. |
![]() |
| Sono Tubes will be used as forms for the concrete columns. |
![]() |
| Drilling holes into solid rock for cementing bolts and re-bar directly into Pender Island, as we call any unmovable rock. |
![]() |
| This is the re-bar structure inside one of the concrete columns. The verticals are cemented 15cm (6") into Pender Island. |
![]() |
| Making progress with putting together the re-bar structures. |