Thursday, May 18, 2017

Mounting the Solar Panels

The panels need to be carried one by one from their storage
location in the cabin to the work site. Each weighs 19kg.
The first panel is up.

Judy up on scaffolding to help sliding the panels up to their location.

The highest panels are 3-4m high off the ground, and
behind the array there is a steep drop-off.

Judy provides valuable help in getting the panels up to their location.

WOW - done.

15 Panels with an electrical capacity of 4kW, weighing nearly 300kg.
We both are proud that we managed to do it all without
outside help, except for the concrete work.