Saturday, February 28, 2015

The Roof Sandwich

Hard foam insulation is added above the wood decking.
The first layer of hard foam forms the vapour barrier.

A total thickness of 7 inches of hard foam achieves
an insulation value of approximately R 34.

Hard foam insulation material.

This tape is used to seal the insulation panels
of the first layer together, creating the vapour barrier.

A layer of 1/2 inch plywood is added on top
of the insulation.
The next layer is this roofing membrane.

Installation of the roofing membrane.

This is how you do it.

The membrane makes the roof watertight.
The steel roof will follow on top of that.

View from the roof.
Work is going on under the tarp to install
the wood decking on the north side.

Interior view of the ceiling formed by the wood decking.

Kitchen ceiling

Posts and beams and ceiling.

Living room / dining room ceiling.

Saturday, February 21, 2015

Roof Decking Installation

A perfect weather forecast for the week to take
off the tarps and start installing the roof decking.

The roof decking is factory pre-stained 2x6
tongue and groove spruce. The stain is a
transparent white. The stained side will form the
interior ceiling above the roof rafters.
The rafters will be painted white for contrast.

Scaffolding is in place for secure working on the roof.

The tarps are coming off.
Paul installing the decking.
Inside the living room.

Looking through from living room to bedroom.

Friday, February 13, 2015

Mid-February Site Visit

Site overview from the lower parking area.

Roof rafters for the kitchen ceiling.

Incredible glue: Bonds wet, frozen, and treated lumber.
Used between floor joists and subfloor.
Stays pliable; prevents creaking floors.

View from door on back veranda
into the moss garden.

Spring is just around the corner.

Mt. Baker glows in winter sun with a fresh coat of snow.
Seen from the ferry, looking across Point Roberts.

Saturday, February 7, 2015

Roof Framing over the Back Steps

Roof framing over the NE corner at the top of the stairway.

Roof framing over the stairway.

Stairway and roof framing at the back of the house.
Concrete steps from the carport to the back of the house
integrated with the natural bedrock.

Wednesday, January 28, 2015

More on Bumpouts


The bumpouts are an important part of the design.
They add extra space but are not counted as part
of the floor area limitations for a cottage, as defined
by Islands Trust for North Pender Island.  

Working on the bedroom bumpouts.

A quick, on-site pencil sketch
with dimensions for framing the windows.

The original concept drawing from the 3D model.
Desk on the left.
Ship's bed with storage under and shelves
and cabinets at head within the bumpout.



Framing done.
Desk bumpout on the left, bed bumpout on the right

View into the forest from Judy's desk.

Desk bumpout from the outside.

Working on the living room window bench bumpout.

Window bench corner.

Concrete steps in the back.

As good as it gets.

Thursday, January 22, 2015

Working on Bumpouts and Stairway


The bookshelf bumpout.

Fresh concrete on upper stair landing.

Barry working on forms for concrete steps.

Crawl space under the kitchen.

The back veranda.

Fresh ammunition for the nail gun.

Fresh ammunition for the nail gun.

Two tool belts.

Paul checking: Is it plumb?
Urs doing chainsaw maintenance