Building the forms for the concrete foundation walls

Ron drilling into solid rock 45 cm deep for re-bar
Barry cutting re-bar
Barry measuring re-bar height
Barry chipping out a channel for electrical conduits
Re-bar in place. Vertical re-bar cemented into solid rock.
Ron drilling into solid rock 45 cm deep for re-bar.
As specified by the geo-technical engineer, one 20mm re-bar
is cemented into solid rock 45 cm deep every 90 cm
The foundation walls are built directly onto solid rock

All vertical re-bars are cemented into solid rock. 