| Ron drilling into solid rock 45 cm deep for re-bar |
![]() |
| Barry cutting re-bar |
![]() |
| Barry measuring re-bar height |
![]() |
| Barry chipping out a channel for electrical conduits |
![]() |
| Re-bar in place. Vertical re-bar cemented into solid rock. |
![]() |
| Ron drilling into solid rock 45 cm deep for re-bar. |
![]() |
| As specified by the geo-technical engineer, one 20mm re-bar is cemented into solid rock 45 cm deep every 90 cm |
![]() |
| The foundation walls are built directly onto solid rock |
![]() |
| All vertical re-bars are cemented into solid rock. |