Tuesday, October 14, 2014

Laying pipes and conduits and backfilling between cisterns and foundation wall

Sewer line and electrical conduits
Sewer line clean-out
Electrical conduits going into shed
An 8-foot container will serve as a generator house
and electrical shed
Paul and Shane building the back wall of the pump house
Barry distributing fill material
First sand is used to embed the pipes.
Top fill is pit-run and shale.
Paul and Barry working at back wall of pump house
Elbows for gas lines coming out of the ground
Scott installing gas steel elbow
Dump truck delivering loads of sand, pit-run and shale.
Steel elbow connected to gas line.

Barry - watch your finger!
The back wall of the pump house is growing
while the fill pile is growing too. The top bulk fill is shale.
Delivering shale
The pump house