| Evening light in the moss garden. |
![]() |
| Updated view from the east side. The rain screen barrier is mostly done. The curved support brackets have been added under the bed bumpout. |
![]() |
| A large hole has been cut into the kitchen roof for a skylight. This clearly shows the layers of hard foam insulation embedded in the roof. |
![]() |
| Paul working on flashing details for the skylight. |
![]() |
| A band of 2 x 12 has been added around the veranda floor. It will run all around the house. |
![]() |
| The band of 2x12. It was painted to match the siding in colour, but in a darker tone. |
![]() |
| Mike drilling through corner for wiring. |
![]() |
| Erin pulling wires through. |