Header Image

Header Image

Friday, May 22, 2015

Progress on the House


Paul working on siding

Paul working on siding

Interface between wall and veranda floor.

The frame for the green roof over the water cisterns.

Roofer Tim torching on the tar for a watertight basin.

It's not a swimming pool.

Urs's job - freshly painted fire sprinkler system pipes.

Fire pipes in loft.

Urs's job - installation of piping for central vaccum cleaner.

A female rufous hummingbird was caught inside the house.
An electrical wire provided a handy perch to rest.
Eventually, it found the exit through the loft windows.


No comments:

Post a Comment