Tuesday, October 7, 2014

Pouring concrete for the first part of the foundation

Delivery of 10 yards of concrete
Pouring Concrete
Paul, Barry, Shane, and Jim
This space will become the battery compartment
for the solar energy system
Paul, Barry and Shane working hard to pour concrete into
forms and vibrating it to make it flow well

The new concrete floor for the pump house
between the two cisterns
A full-size concrete truck
Extra concrete is used by Urs to do the first three
steps to the sundeck with in-laid natural rock
Video of Concrete Pouring 1

Video of concrete pouring 2

Thursday, September 18, 2014

Barry and Priscilla

At 18 years old, Priscilla has somewhat
wobbly legs, but still a gleam in her eyes.

Saturday, September 13, 2014

A weekend excursion to other islands

Judy on fore deck of Raven Song
Judy on bow seat of Raven Song at a favourite anchorage
Sunset mood

Friday, September 12, 2014

Site clearing and excavation


Stacking logs
Hauling away slash and stumps
Moving the old outhouse out of the way
Excavating the building site
Large rock slabs removed
Excavating down to solid sandstone rock
Steve with the excavator
Steve
Using the large jackhammer to break out rock
Hauling away logs; Steve and Peter
One load of firewood
One load of saw logs. These will later be cut into beams.
Steve building the "Great Wall."
Cleaned up to bare solid rock
Solid rock under the kitchen
More jackhammer time to carve out space for the cisterns 




Wednesday, September 10, 2014

Surveying work to determine the exact corner locations


Paul studying the location of the building's corners
David on the instrument and Paul on the laser reflector
The laser reflector
David and Urs working the survey
Paul the builder with David the surveyor


Tuesday, August 19, 2014

Measuring the height of the tree obstructions to solar energy collection

How many degrees above the horizon is that tree top?
A home-built plywood sextant to measure vertical angles.
Survey field notes
Field notes recorded in a spreadsheet and
converted to true azimuth angles.
Field notes plotted on site plan
Some notes about height angles and solar paths
A rough plot of tree heights and solar paths for
spring, summer, fall, and winter.
Conclusion: in winter the back-up generator will get its excercise.

View to southeast from intended solar collector installation.